xxxxxxx

dagan

Yates | SE VENDE LUJOSO YATE – SUNSEEKER

Se vende yate de lujo SUNSEEKER, modelo predator, fuul equipo y extras Equipo de sonido de alta calidad y potencia ( personalizado) Desalinizador Televisión por satélite Internet Moto de agua en la popa Sofisticado equipo de navegación, con piloto automático, radar, ecosonda y GPS. Thruster de proa y popa Potente aire acondicionado Motores MAN Recién .. read more

23
Mar
posted in: blog by

sy asahi

Dear David, I`m assuming our Chief, Arran, has emailed you to cancel as we went straight out to sea?? In any case, thank you very much for your help. You are always a pleasure to work with. Please bill us for any hours that the Caterpillar tech was standing by. We certainly had no intention .. read more

23
Mar
posted in: Uncategorized by

ANASTASIA

Hi David and Tony, Thank you very much for your support, the watermaker is now up and running, manually for the time being. When we got the technician onboard, he was very competent and he found out that it was no problem with CAT-pump or membrane, The saltwater was going backwards in to the freshwater .. read more

23
Mar
posted in: Recent Customers by

M/Y Musashi in her maiden transit through the Panama Canal

In December 2012, Matchship International assisted M/Y Musashi in her maiden transit through the Panama Canal. From start to finish Matchship showed and maintained a level of professionalism and service that as clients we always recognise and value. They fully anticipated and understood our vessels level of operation andspecific requirements, and delivered a service in conjunction with .. read more

10
Feb
posted in: Latest Customers by

Planning to transit the Panama Canal this coming dry season?

Please take in consideration the following: If you choose to transit without using an official agent you may face different problems such as language barrier, the payment of a security deposit of US$850 which will be reimbursed to your bank account only after about 6-8 weeks, no insurance against problems during the transit, etc. While .. read more

19
Dec
posted in: Uncategorized by

The Panama Canal expansion project

Also called the Third Set of Locks Project, will double the capacity of the Panama Canal by 2015 by creating a new lane of traffic and allowing more and larger ships to transit. The project will: Build two new locks, one each on the Atlantic and Pacific sides. Each will have three chambers with water-saving .. read more

09
Nov
posted in: Uncategorized by